Previous incidents
March 2026
February 2026
Feb 08, 2026
3 incidents
Incorrect egress routing
Degraded
Resolved Feb 08 at 09:42pm MSK
We have returned AuroLogic as the standard exit route after checking that the routes are working properly.
3 previous updates
Node failure
Downtime
Resolved Feb 08 at 08:40pm MSK
As a result of monitoring, incorrect operation of the server was detected. At this stage, measures have been taken to mitigate the consequences and prevent future failures.
The server will be decommissioned in the coming days for a detailed study of the issue.
1 previous update
Incorrect ingress routing
Degraded
Resolved Feb 08 at 05:42pm MSK
The incident was completely resolved on the side of our upstream AuroLogic
1 previous update
January 2026